Equipment Supply for Your Next Product Range
KMSLASER is based in Guangzhou. We supply shockwave, pressotherapy, magnetotherapy and Tecar therapy equipment to brands, wholesalers and distributors in the United States, Canada and Europe.
Share your model, market and branding requirements. Order terms are confirmed in your quotation.
Factory Photo Gallery
More site photographs await confirmation.
Equipment Supply for Brands and Distributors
KMSLASER is based in Guangzhou and supplies shockwave, pressotherapy, magnetotherapy and Tecar equipment to brands, wholesalers and distributors in the United States, Canada and Europe.
Share your chosen model, target market and branding requirements. The available OEM/ODM options and order terms will be confirmed in your quotation.
Start with your product range
Tell us which line and market you are sourcing for. You can read about each line first:
Mission and Vision
Mission
To help buyers pin down the configuration they need and the evidence they should ask for, before an order is placed.
Vision
Vision statement pending owner confirmation.
What We Supply and What We Ask You to Specify
Shockwave therapy. Tell us the technology you want and your target market. If you are still comparing, read pneumatic ballistic vs electromagnetic shockwave or the questions to ask a supplier.
Pressotherapy. Decide on the garment format and the number of chambers. Our guide to one-piece vs split suits covers the main trade-offs for European sourcing.
Magnetotherapy. Send the applicator configuration, plug standard and interface language you need for your market.
Tecar (CET/RET). Send the handpiece and electrode set you expect, plus branding and packaging requirements.
FS-86 PRO
Shockwave therapy
BR619
Pressotherapy
MS-39 PRO
Magnetotherapy
ITB-2000
Tecar (CET/RET)
OEM/ODM routes
Private label a standard model, or co-develop from your specification.
Inspection records
In-production and pre-shipment inspection. Ask for the records.
Order updates
Order status tracking after the purchase order is confirmed.
Door-to-door logistics
Shipping terms are confirmed in the quotation.
Company Figures
No figures are published until each one is backed by a document.
Year established
Pending
Needed: Business registration or licence record
Team
Pending
Needed: Roster or organisation chart approved for publication
Production area
Pending
Needed: Floor plan or lease/ownership record
Annual output
Pending
Needed: Production records by product line
Six Things to Check Before You Partner With Us
Each card is a point your purchasing team should verify with any supplier, including us.
OEM/ODM engineering route
Ask who does the engineering, and whether a change request gets a technical answer.
In-production inspection
Ask what is checked while the batch is still running, and how it is recorded.
Pre-shipment inspection
Ask for the inspection scope and records before the container is sealed.
Order-status updates
Ask how and when you are updated, so you do not have to chase.
Door-to-door logistics
Ask which shipping terms apply and who owns each leg of the journey.
Model-matched documents
Ask for documents that match your exact model and target market.
Evidence pending: supporting photos and records for each point are still to be supplied.
Development History
This timeline has seven slots. Each one is filled only when we have a dated record to show for it. Dates and milestones stay marked Pending until the owner supplies that material.
-
Photo pending Node 1
Date: Pending
Company founding
Milestone details pending. Needed: Registration record or first-site photo.
-
Photo pending Node 2
Date: Pending
First product line
Milestone details pending. Needed: First machine model and its launch record.
-
Photo pending Node 3
Date: Pending
Engineering team formed
Milestone details pending. Needed: Team photo or project record.
-
Photo pending Node 4
Date: Pending
First export order
Milestone details pending. Needed: Export document with buyer details masked.
- Send Inquiry
-
Photo pending Node 5
Date: Pending
Inspection process documented
Milestone details pending. Needed: Inspection form or procedure document.
-
Photo pending Node 6
Date: Pending
Product line expansion
Milestone details pending. Needed: Product range photo with launch dates.
-
Photo pending Node 7
Date: Pending
Current range
Milestone details pending. Needed: Current product line photo.
Production Equipment
Buyers should be able to see what equipment is used to build and test their machines. A model list and original workshop photos are still pending.
Evidence pending: equipment model list, purpose of each item and workshop photos taken by the team.
Equipment & Process Records
Evidence pending: what each piece of equipment is used for, and proof that the company owns or controls it. Photos alone are not enough.
If you need this information for supplier approval, tell us in your inquiry.
Inspection Records
We run inspection during production and again before shipment. The record sample to publish here is pending. It needs to show the items checked, the sampling method and the record format.
Model-Matched Documentation
Documents have to match the specific model and the market you are selling into. Certificate files are pending and will not be shown until they are verified. In your inquiry, name the model and the destination market.
The People Behind Your Order
Buyers want to know who handles engineering questions, inspection and shipping. Names, responsibilities and permission to publish photos are pending for each person.
Each card holds two photos: a portrait and a photo of the person at work.
Name pending
Responsibility pending (suggested: Engineering)
Photo authorisation pending
Name pending
Responsibility pending (suggested: Quality control)
Photo authorisation pending
Name pending
Responsibility pending (suggested: Order tracking)
Photo authorisation pending
Name pending
Responsibility pending (suggested: Logistics)
Photo authorisation pending
Name pending
Responsibility pending (suggested: Sales and export)
Photo authorisation pending
Name pending
Responsibility pending (suggested: After-sales)
Photo authorisation pending
Who Owns Each Step
After the purchase order, each step needs a named owner. These six slots show the roles buyers usually ask about. Photos and the person responsible for each role are pending. Team size is not stated.
Product engineering
Person responsible: pending
Production supervision
Person responsible: pending
In-production inspection
Person responsible: pending
Pre-shipment inspection
Person responsible: pending
Order tracking
Person responsible: pending
Logistics coordination
Person responsible: pending
Catalogue and Technical Materials
The product catalogue is being prepared. It will list models and configurations for the four lines.
User manuals will be added once they are matched to specific models.
Technical drawings will be shared on request for buyers who are evaluating an OEM/ODM project.
- Product Catalogue — upload pending
- User Manuals — upload pending
- Technical Drawings — upload pending
- Send Inquiry
Discuss Your Supply Requirements
The more precise your brief, the more precise our technical answer. Please include as much of the following as you have:
- Product line and model of interest: shockwave, pressotherapy, magnetotherapy or Tecar.
- Target market and its regulatory requirements (United States, Canada or Europe).
- OEM/ODM route: private label on a standard model, or a specification to develop.
- Branding, interface language, plug standard and packaging needs.
- Documents and inspection records you need.
- Expected quantity and shipping terms. These are confirmed in the quotation.
Your inquiry is handled by Sophia Wu.